SMT and PTH assembly, turnkey or consigned, from prototype to continuous production. With your BOM, Gerber files and forecast volume, our engineering team can assess manufacturability and prepare a technical quotation, not just a price.
What we need to quote
BOM, bill of materialsOne line per component, with manufacturer, part number and approved alternates. Use our template below.
GerberBoard fabrication files, RS-274X or ODB++, including the solder paste layers for the stencil.
Centroid, XY filePosition, rotation and side for each component. It is what programs the placement machines.
Volume and recurrenceSingle batch or continuous production, and the quantity per batch.
Supply modelTurnkey, consigned, capacity for those who already manufacture, or components only.
RequirementsIPC class, lead free or SnPb finish, regulatory requirement and test specification, if any.
Fourtech specification and BOM template
Four tabs: instructions, board and process specification, a full 26-column BOM with validation, and a dedicated tab for component-only quotes.
No Gerber or BOM finalized yet? Fourtech engineering does co-development and DFM before the first board. Describe the project in the form and the conversation starts there.